极品人妻被隔壁邻居侵犯|√天堂在线资源|国产免费天天看高清影视在线|最好看的2018免费观看在线|婷婷丁香五月花|麻豆福利在线精品视频|婷婷六月综合站|久草在线观看福利

行業(yè)產(chǎn)品

  • 行業(yè)產(chǎn)品

上海威韜機電設備有限公司


當前位置:上海威韜機電設備有限公司>>SIEMENS燃氣檢漏儀>>LDU11燃氣檢漏控制器

LDU11燃氣檢漏控制器

返回列表頁
參  考  價面議
具體成交價以合同協(xié)議為準

產(chǎn)品型號

品       牌

廠商性質其他

所  在  地

聯(lián)系方式:陳先生查看聯(lián)系方式

更新時間:2025-07-17 12:19:47瀏覽次數(shù):54次

聯(lián)系我時,請告知來自 環(huán)保在線

經(jīng)營模式:其他

商鋪產(chǎn)品:115條

所在地區(qū):

聯(lián)系人:陳先生

產(chǎn)品簡介

LDU11燃氣檢漏控制器

詳細介紹

>>產(chǎn)品說明

The LDU11... control detects leakage of the shut-off valves on gas trains with two safety shutoff valves. During each burner cycle, the LDU control unit automatically sequences, and if a leak is detected, initiates a lockout and prevents the burner from starting up.
  • Performs leak test of the gas shut-off valves before start-up and/or immediately after burner shut-down
  • No inlet gas pressure limitations
  • Easy-to-read dial indicates progress of test program
  • Ability to eliminate or leak test the vent valve
  • Cost effective control improves system safety
  • Globally Approved ?cULus, FM, CE

The LDU11 (or control unit) is used in a gas-fired combustion system with or without a vent valve in the gas train.

Installed with one or two pressure switches mounted between the gas valves, the LDU automatically initiates gas valve proving either

  • prior to burner start-up
  • immediately after the controlled shutdown, or
  • both prior to burner start-up and immediately after shutdown

The valve leak test is completed in two stages:

  • First test phase Test1, evacuates the pressure between the gas valves to test the upstream gas shutoff valve. The pipe between the gas valves is monitored by a leak detect pressure switch for no increase in pressure.
  • Second test phase Test2, pressurizes the area between the gas valves to test the downstream safety shutoff valve. The pipe between the gas valves is monitored by the leak detect pressure switch for no decrease in pressure.

If the leak detect switch signals excessive gas pressure increase during the first test phase Test1, or decrease during the second test phase Test2, the LDU control will lockout and prevent burner start-up. The indicator dial on the front of the unit indicates the progress of the leak test. When a fault occurs, the indicator dial stops at the time of lockout, and indicates which of the valves is leaking. In the event of a lockout, the reset button on the front of the control will light orange to indicate a fault.

Pushing the clear window in front of the indicator dial once will reset the LDU control. DO NOT hold in the reset button. The LDU may also be reset with a remote button (see wiring diagram).

型號表
型號 主電壓 Hz
LDU11.523A27 AC220-240V 50...60
LDU11.523A17 AC100-110V 50...60
技術參數(shù)
主要參數(shù)
主電壓 AC220V -15%...AC240V +10%
AC100V -15%...AC110V +10%
主頻率 50Hz ±6%
外部保險絲 10A
功率
-測試 3.5VA
-運行 2.5VA
重量 4 lbs
保護等級 NEMA 1,2,5,12,13
環(huán)境條件
運輸環(huán)境 IEC 60 721-3-2
內部條件 class 2K2
溫度范圍 -58...+140ºF
機械條件 class 2M2
濕度 <95%
運行環(huán)境 IEC 60 721-3-3
內部條件 class 3K5
機械條件 class 3M2
溫度范圍 -5...+140ºF
濕度 <95%
不得進水


感興趣的產(chǎn)品PRODUCTS YOU ARE INTERESTED IN

環(huán)保在線 設計制作,未經(jīng)允許翻錄必究 .? ? ? Copyright(C)?2021 http://www.bulouwang.com,All rights reserved.

以上信息由企業(yè)自行提供,信息內容的真實性、準確性和合法性由相關企業(yè)負責,環(huán)保在線對此不承擔任何保證責任。 溫馨提示:為規(guī)避購買風險,建議您在購買產(chǎn)品前務必確認供應商資質及產(chǎn)品質量。

會員登錄

×

請輸入賬號

請輸入密碼

=

請輸驗證碼

收藏該商鋪

登錄 后再收藏

提示

您的留言已提交成功!我們將在第一時間回復您~